Project Overview
KITCHEN
Removed the old kitchen unit and installed new kitchen unit in the same position as existing place.
- The waste pipe, hot and cold water pipe kept in the same place as existing.
- Kitchen floor removed all the existing tiles and replaced the tiles with the new marble
PLUMBING JOB (Heating,Hot and Cold and Waste pipes )
All the Hot, Cold water and Waste pipes Connection done as existing.
- Disconnected the heating supply and returned and installed a new liver valves for both the supply and return pipe.
- Replaced all the heating pipes and used special coated copper pipe and no connector or any valves under the floor
- Replaced all the heating radiators
- Cancelled all the old hot and cold water pipe for all bathrooms and kitchen and use new special coated copper pipes.
SHOWER ROOM
MASTER SHOWER ROOM
SHARE SHOWER ROOM
- Removed all the old shower room santi ware and installed new one as in the same existing places.
- Removed all the old tiles and laid new porcelain tiles or changed them to marble
- Replaced the bath in bathroom 3 and make it shower room as in the same existing place
THE FLOORING
- Removed all the wood floor carpet and the solid wood floor, the sanding is done and given wood dye colour and make it good furnishing.
DOOR WITH FRAMES AND SKIRTING BOARDS
- Replaced all the internal doors with the frame except the main door of the flat , and skirting boards.
ELECTRICAL JOBS
- New rewiring with new lighting, switches and issue NIC certificate.
Paint and Decorating
Paint and decorating the wall and ceiling for the complete flat internally DONE
DOUBLE GLAZING WINDOW
- There are two metal old windows one in the kitchen and other in the hall way bedside bedroom which need to be replaced to double glazing white window same as the other window in the flat