Refurbishment for Flat 4A Pembridge Square W2

Project Overview

 

  1. Clearance

1) Removed all the flooring, underlay and any MDF or underneath wood.  Removed all the master bathroom sanitary ware.

2) Took  out the kitchen doors,  wooden furniture and kitchen appliances and also other building rubbish and disposed

3)Wooden Floor completely covered with PVC heavy duty and cloth dust sheets.

 Plumbing 

  1. Installed new pipes for the cold and hot water for the sink
  2. Installed new pipe for cold water for dishwasher and another pipe for washing machine
  3. Checked the gas pipe
  4. Checked the boiler gas pipe
  5. Cancelled the disposal unit under the sink and made normal standard waste pipe drain
  6. Installed new drain pipe for dishwasher and washing machine

 Electrical 

Created new wiring power x 3 double sockets and each for appliances points, one power socket behind the dishwasher and fuse spares to control. We need total 10 points for power supply for dishwasher, washing machine, cooker hood, and fridge

Tiling

The same size and type of tiles are used for  wall and floor.  Mosaic tiles  are used for  the splash back between wall unit and work top

Carpentry 

New kitchen unit with door is supplied by Square Melon

  1. Share Shower Room  Silicon around all the corners and replaced the wooden panel under wash basin made it accessible. Proper cleaning done.

 

Master Bathroom -Full Refurbishment

1) Removed the bath, toilet, washbasin, mirror, wall and floor tiles.

2) Laid  new porcelain tiles for wall and floor

3) Installed new bath 1220mm x715mm Trojan Kent bath  not in the same existing placed and, installed to the end of the bath room in horizontal way.

4) Installed  new Vanity Unit & WC unit with one piece top, new electrical towel rail size 40 x1m

5) Installed branded and quality bath shower mixer with shower head kit.

6) Replaced the halogen ceiling light to LED water proof with complete down light fitting, paint the complete ceiling

7) pened the  ceiling for the bathroom to reach the extractor fan deck for the next shower room, which need to be cut  and add non return valve and put T connection to connect the new extractor fan for new bathroom so both will be in one deck.

 

8) Put the plaster board to cover the big whole which will be made on the ceiling.

 

Paint and Decorating

1) Paint the ceiling and wall for complete sitting room, hall way, bedroom one and bedroom two with white matt colour

 

2) Paint wood work; (skirting board, 6 doors and front door from inside)

 

Sitting room window

1) Reaped down, repaired cracking, sanding, and undercoat then repainted inside and outside

Wardrobes for two in the master bedroom and one in the room 2 repaired; do sanding make it fine to repaint.

Replaced all the doors handles and wardrobes door knobs and door hinges  

Electrical Jobs

  1. Replaced the Ceiling down Light Fitting in Kitchen satin chrome with LED Bulbs x 9
  2. Replaced the Ceiling down Light Fitting in the bedroom one, satin chrome with LED Bulbs
  3. Replaced the Waterproof Ceiling down Light Fitting in master bathroom, satin chrome with LED Bulbs x 5 and
  4. Installed new shaver socket chrome beside the wash basin.
  5. Replaced the ceiling down Light Fitting for hallway, satin chrome with LED Bulbs x 4
  6. Replaced all the electrical points, sockets, and switches, fuse spares (satin chrome or brass) which you supply.

 

 

 

Our kitchen and bathroom was installed within days, very pleased with the fast and clean work the guys at Redmount offered! Would recommend them to everyone I know!

Jack B, London W5